April – The estimate arrived but we still had questions as there were no drawings or detailed schedules such as for the replacement windows. These are being specially made to replicate the look of the 1800 windows but will be a single unit rather than the 6 separate panes. We also realised that, in order to do the work on the workshop, we will have to empty it out completely. This will take a long time and we will need to put the stuff somewhere out of the weather. We have asked about a lockable storage container. Because it has taken so long to get to this stage, we did not feel able to go ahead in June as offered as we need time to complete our vegetable planting before tackling emptying the workshop. We have therefore deferred the work until August.
First the vegetable planting, then we’ll tackle emptying the workshop
by The Pinders on 17. Jun, 2010 in Thornbury: detached cottage
Leave a Reply
Latest posts
- Side wall insulated
- July 2011 Update
- Accoya timber – sustainable softwood that lasts for 50+ years?
- Mechanical Ventilation with Heat Recovery (MHVR)
- External wall insulation
- New Refit West report on real homeowner retrofit journeys
- Refit West webinar – an update from the Bristol front line
- Finally….
Homes
- Bathwick: Victorian mid-terrace (8)
- Bishopston: three bed semi (10)
- Easton: Victorian mid-terrace (2)
- Knowle West: Two storey end terrace (1)
- Redland three storey end terrace (6)
- Redland: Victorian semi (14)
- Refit know how (5)
- Southville: Victorian end-terrace (1)
- St Andrews: Victorian semi (4)
- St Andrews: Victorian semi with attic (1)
- Thornbury: detached cottage (11)
- Whitchurch: three bed semi (1)
Updates
Keep informed about updates from Refit West with our RSS feed or by subscribing to email alerts.
Latest comments
- Chris Preist on The Proof of the Pudding…
- David Watsham on The Proof of the Pudding…